I have been absent from school for many days due to sickness. During that time, many good ideas were developed, and when I returned to school we had a final design. However, certain teammates are insisting that their design is better, and we have been switching designs too frequently. I think that different teammates are currently working on different designs. The teammate that is working on solenoids is very frustrating because they don't bother to explain it to others and insist on working by themselves. As a result, my team is spread very thin.
I submitted my Early Action college application on the 15th of October. I began working on it extremely late and was very stressed from the beginning of October until the deadline. After Sunday, I still have to record music videos for my portfolio, which are due by the 20th. I am less stressed than before, but still stressed.
Comments